API 570 Piping Inspector Certification Examination Preparatory

  • Course Code
    APIQ-002

API 570 Piping Inspector Certification Examination Preparatory

  • Progressive corrosion deteriorates pressure retaining walls to such an extent that there is always a threat of major break down which may lead to fire or some time to explosion 
  • To avoid such accidents API has developed systematic ways to carry out ‘In-service Inspection’ to determine rate of corrosion and the remaining life of the equipment and piping
  • The API initiated the Piping Inspector certification program to provide a continued high level of safety using Inspectors specialized in process piping.  The program promotes self-regulation, establishing a uniform standard that will assist national, regional and local governments in setting Process Piping regulations

Learning Outcomes

    • This course will prepare an Inspector to successfully complete the API 570 Authorized Piping Inspector Certification Examination by thoroughly reviewing the API 570 Standard, APT CERT 571, API CERT 574, API CERT 577, API CERT 578 the ASME Boiler and Pressure Vessel Code Sections V and IX, and the ASME Code for Pressure Piping B16.5 and B31.3.  
    • Mock examination questions, meeting the appropriate specific examination criteria, will be utilized to simulate actual API test conditions, providing an effective study base.
    • Participants will be presented with a detailed course book and will become thoroughly acquainted with the elements, aspects and requirements of API 570 – Piping Inspection.
    • This course will help to improve management control of process unit inspection, repair, alteration and re-rating of In-Service Piping Systems and to reduce the potential for inspection delays resulting from meeting regulatory requirements.

Course Contents

    Session 1

    • Introduction to API 570
    • Certification examination information
    • Body of Skill Makers — API 570
    • Introduction to Piping Code, B 31.3

    Session 2

    • Impact testing requirements
    • Design of piping components — ASME B 31.3
    • Thickness calculations for pipes and blanks

    Session 3

    • Pressure tests
    • Hydrostatic
    • Pneumatic
    • Pre-heating and PWHT requirements for piping
    • Daily Quiz

    Session 1

    • Points to recall
    • Review of Quiz
    • Selection of flanges Pr-temp. ratings & Pressure testing of flanges
    • Evaluation of flanged fittings

    Session 2

    • Material for pipes and fittings
    • Common ASTM specifications
    • Introduction to API 570
    • API 570 Scope, applicability & limitations
    • QA Manual. Organization and responsibilities

    Session 3

    • Authorized inspection agency
    • Repair organization
    • Inspection practices; RBI inspection
    • Daily Quiz

    Session 1

    • Points to recall, Review of Quiz
    • Deteriorating piping components
    • CUI, SCC, creep and fatigue failures
    • Inspection methods

    Session 2

    • Determining inspection frequencies
    • Extent of inspection
    • Corrosion under insulation
    • Inspection Data Evaluation

    Session 3

    • Evaluation of thinned areas
    • Evaluation of pitted areas
    • Determining safe MAWP
    • Daily Quiz

    Session 1

    • Points to recall, Review of Quiz
    • Repairs, alterations, re-rating of piping systems
    • Repair and alteration procedures

    Session 2

    • Inspection Of Buried Piping
    • Corrosivity tests
    • Cathodic protection of buried piping

    Session 3

    • Leak testing of piping
    • Retirement thickness
    • Inspection records
    • Daily Quiz

    Session 1

    • Points to recall, Review of Quiz
    • API 574 — Piping components
    • Inspection practices
    • Selection of TMLs
    • Retirement thickness calculation for valves and flanged fittings

    Session 2

    • ASME Section IX Requirements
    • Welding qualifications
    • WPS/PQR tests and documentation
    • Performance qualifications

    Session 3

    • Review of WPS/PQR documents
    • Additional WPS/PQR requirements as per ASME B 31.3 and API 570
    • Welding Inspection requirements as per B 31.3
    • Daily Quiz

    Session 1

    • Points to recall, Review of Quiz
    • ASME Section V Requirements
    • Non-destructive testing procedures
    • Procedural requirements for RT, PT, MT, UT

    Session 2

    • NDT procedures
    • visual testing
    • bubble test
    • Final Simulated Exam (Open book)

    Session 3

    • Final Simulated Exam (Close book)
    • Review of open book and closed book exams
    • Test taking tips
    • Discussion on planning and preparation for the actual exam
    • Feedback
    • Concluding Session

Our Methodology

    • Make coaching and monitoring innovative and using modern
    • Media training also using on the go training by using interactive means and focusing on
    • The exercises, practical applications and real situations study
    • Live delivery method, instructor-led training
    • Experienced consultant, trainers, and professional
    • Qualified trainer with high-level experience

Attendance Reports

    • Send daily attendance reports to training departments
    • Send full attendance report to training dep. by the end of the course
    • Attend 100 % from the course days also provide daily
    • Issue attendance certificate for participant who attend minimum 80% from the course duration

Pre/Post Reports

    • Pre- assessment before starting training
    • Post assessment after finishing training
    • Full report for the difference between Pre-& Post assessment

Who Should Attend

    • This course is tailored for Engineers, Supervisors, Managers and personnel who are interested in the API 570 program, or who are responsible for inspection, maintenance, repair and alteration of piping systems, and who wish to present themselves for the Piping Inspector Certification Examination
Date City Venue Language Price Status Register
06 Oct 17 Oct - 2024 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
10 Nov 21 Nov - 2024 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
08 Dec 19 Dec - 2024 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
12 Jan 23 Jan - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
09 Feb 20 Feb - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
06 Apr 17 Apr - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
04 May 15 May - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
15 Jun 26 Jun - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
29 Jun 10 Jul - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
03 Aug 14 Aug - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
07 Sep 18 Sep - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
12 Oct 23 Oct - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
16 Nov 27 Nov - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
14 Dec 25 Dec - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register