API 580 Risk Based Inspection Certification Examination Preparatory

  • Course Code
    APIQ-004

API 580 Risk Based Inspection Certification Examination Preparatory

  • This course presents the general methodology of Risk Based Inspection, identifies the key elements of an RBI program, and discusses how to implement an RBI program.  API 580 is a recommended practice created by the American Petroleum Institute that provides guidance in developing, implementing, and maintaining Risk Based inspection (RBI).  It foregrounds safety and reliability through risk-prioritized inspection.
  • Risk-Based Inspection exam preparation training will clearly define the principles and guidelines to execute risk-based inspection methodology in the oil and gas industry. In addition to the knowledge required to pass the certification exam, this course also includes advanced knowledge of defining, conceptualizing, and implementing RBI. Candidates must have at least one of API 510, API 570, or API 653 certifications.

Learning Outcomes

    • Understand the purpose, scope, and examination of the critical steps in the RBI process
    • Discussion of risk-based inspection documentation and record-keeping needs
    • Understanding of the basic concepts of risk acceptance, risk assessment, risk perception, risk mitigation and managing residual risk. 
    • Understand reassessments and means for updating RBI. Implementation of RBI in Oil and Gas industry
    • Understanding of the nature of corrosion patterns, exact causes of corrosion and prediction of locations where corrosion would take place and where to focus the in-service inspection efforts to get best results in minimum efforts
    • Helps the participants to get a thorough overview optimum implementation of API in-service inspection program. In other words, estimate the level of RISK and orient in-service inspection accordingly
    • The course heavily relies on practical utility of this Recommended Practice by covering several examples, exercises and case studies

Course Contents

    • Benchmark Quiz
    • What are causes and patterns of various corrosions in Oil and Gas Industry?
    • Objectives of in-service API inspection programs (510/570/ 653)
    • Understanding of effectiveness of standard API inspection programs (510/570/ 653)
    • Discussion on limitation of standard API inspection programs (510/570/ 653).
    • Quick overview of API (510/570/ 653) codes.
    • BASIC CONCEPTS. What is Risk?
    • Risk Management and Risk Reduction
    • The Evolution of Inspection Intervals.
    • Inspection Optimization 
    • Relative Risk vs. Absolute Risk
    •    
    • Introduction to Risk Based Inspection
    • Consequence and Probability for Risk-Based Inspection
    • Types of RBI Assessment
    • Precision vs. Accuracy
    • Understanding How RBI Can Help to Manage Operating Risks
    • Management of Risks 
    • Relationship Between RBI and Other Risk-Based and Safety Initiatives
    • Relationship with Jurisdictional Requirements
    • Planning of RBI Assessment
    • Establishing Objectives and Goals of a RBI Assessment
    • Establish Operating Boundaries
    • Selecting a Type of RBI Assessment 
    • Estimating Resources and Time Required
    • Various Methodologies of RBI Assessment (Qualitative, Semi-Quantitative and Quantitative Analysis)
    • Case Study 1 – Qualitative Analysis.
    • Discussions on Case Study 1
    • Case Study 2 – Qualitative Analysis
    • Discussions on Case Study 2 
    • Assessing Probability of Failure 
    • Introduction to Probability Analysis
    • Units of Measure in the Probability of Failure Analysis
    • Types of Probability Analysis Determination of Probability of Failure
    • Assessing Consequences of Failure 
    • Introduction to Consequence Analysis 
    • Types of Consequence Analysis 
    • Units of Measure in Consequence Analysis 
    • Volume of Fluid Released 
    • Consequence Effect Categories
    • Case Study 3 – Quantitative Analysis
    • Probability and Consequences Analysis of Case Study - 3 
    • Determination of Risk
    • Risk Management Decisions and Acceptable Levels of Risk
    • Sensitivity Analysis
    • Risk Presentation, 
    • Establishing Acceptable Risk Thresholds Risk Management
    • Managing Risk by Reducing Uncertainty Through 
    • Identifying Risk Management Opportunities from RBI and Probability of Failure Results 
    • Establishing an Inspection Strategy Based on Risk Assessment
    • Managing Risk with Inspection Activities 
    • Managing Inspection Costs with RBI 
    • Assessing Inspection Results and Determining Corrective Action 
    • Achieving Lowest Life Cycle Costs with RBI
    • Other Risk Management Activities
    • Equipment Replacement and Repair
    • Evaluating Flaws for Fitness-for- Service 
    • Equipment Modification, Redesign and Rerating
    • Emergency Isolation 
    • Emergency Depressurizing/De-inventory 
    • Modify Process
    • Reduce Inventory 
    • Water Spray/Deluge, Water Curtain
    • Blast-Resistant Construction 
    • Case Study – 4
    • RBI Reassessments 
    • Why Conduct a RBI Reassessment? 
    • When to Conduct a RBI Reassessment?
    • Team Approach
    • Team Members, Roles & Responsibilities 
    • Training and Qualifications For RBI Application
    • Post-test inspection 
    • RBI Documentation and record keeping
    • RBI Methodology 
    • RBI Personnel 
    • Time Frame 
    • Assignment of Risk 
    • Assumptions Made to Assess Risk 
    • Risk Assessment Results 
    • Mitigation and Follow-up 
    • Codes, Standards and Government Regulations
    • Final Exam – Closed Book
    • Final Exam – Open Book
    • Feed Back
    • Concluding session RBI Course

Our Methodology

    • Make coaching and monitoring innovative and using modern
    • Media training also using on the go training by using interactive means and focusing on
    • The exercises, practical applications and real situations study
    • Live delivery method, instructor-led training
    • Experienced consultant, trainers, and professional
    • Qualified trainer with high-level experience

Attendance Reports

    • Send daily attendance reports to training departments
    • Send full attendance report to training dep. by the end of the course
    • Attend 100 % from the course days also provide daily
    • Issue attendance certificate for participant who attend minimum 80% from the course duration

Pre/Post Reports

    • Pre- assessment before starting training
    • Post assessment after finish training
    • Full report for the deferent between Pre-& Post assessment

Who Should Attend

    • Professionals involved in maintenance and in-service inspection (API 510/ 570/ 653) of Pressure Vessel Piping, Storage Tanks, and Rotary Equipment
    • Representatives of plant management
    • Operations Engineers
    • Maintenance Engineers
    • Engineering Managers and Supervisors
Date City Venue Language Price Status Register
12 Jan 23 Jan - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
16 Feb 27 Feb - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
06 Apr 17 Apr - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
04 May 15 May - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
15 Jun 26 Jun - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
13 Jul 24 Jul - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
03 Aug 14 Aug - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
07 Sep 18 Sep - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
05 Oct 16 Oct - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
02 Nov 13 Nov - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
30 Nov 11 Dec - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register