ASME B31.3 Process Piping Design Code

  • Course Code
    ASME-003

ASME B31.3 Process Piping Design Code

  • Training course will focus on learning the ASME B31.3 for Pressure process piping for the design, materials examination, testing and nonmetallic piping. This training course further provides an introduction to the different parts of the ASME B31.3 Standard and will cover all requirements for safe design, construction, inspection, testing, operation and maintenance of liquid pipeline systems. 
  • The ASME B31.3 Code focuses on the requirements for process piping related to the design, construction, fabrication, inspection, examination in a safe and economical piping system.

Learning Outcomes

    • Provide the participants with enough knowledge and skills about process piping related ASME B31.3
    • Identify the design of piping flanges and blanket
    • Welding and Brazing Qualification, procedures Specifications
    • Explain the Fabrication, Assembly, and Erection and identify the required inspection and testing Define hydrostatic pressure and hydrostatic-pneumatic tests
    • Receive the enough information about the Fluid Service Requirements for Materials
    • Explain of nonmetallic piping design, Fluid Service Requirements, inspection and testing
    • Employ pre and post weld heat treatment and identify the Charpy impact testing

Course Contents

    • Introduction and history of ASME codes
    • Scope and Definitions
    • Content, Coverage and Exclusions
    • Design include Design Pressure, Design Temperature
    • Listed Components Unlisted Components
    • Allowances for Pressure and Temperature Variations
    • Allowable Stresses and Other Stress Limits
    • Bases for Design Stresses
    • Casting Quality Factor, EC and Weld Joint Quality Factor, EJ
    • Pressure design of components
    • Branch Connections
    • Pressure Design of Flanges and Blanks
    • Fluid service requirements for piping components and piping joints
    • Flexibility and support
    • Chapter iii materials
    • Listed Materials, Unlisted Materials. Unknown Materials. Reclaimed Materials.
    • Lower Temperature Limits
    • Impact Testing Methods and Acceptance Criteria
    • Fluid Service Requirements for Materials
    • Chapter IV Standards for Piping Components
    • Chapter V Fabrication, Assembly, and Erection
    • Welding and Brazing Qualification, procedures Specifications.
    • Preheating
    • Heat treatment requirements
    • Bending and forming
    • Assembly and erection
    • Chapter VI Inspection, Examination, and Testing
    • Responsibility and qualifications for Inspection and examination
    • Extent of Required Examination
    • Radiographic and Ultrasonic Examination
    • Testing Required Leak Test
    • Hydrostatic Leak Test
    • Pneumatic Leak Test
    • Hydrostatic-Pneumatic Leak Test
    • Chapter VII Nonmetallic Piping and Piping Lined with Nonmetals
    • Pressure design of piping components
    • Fluid service requirements for nonmetallic materials
    • Materials general requirements
    • Fabrication, assembly, and erection
    • Inspection, examination, and testing
    • Chapter viii piping for category M Fluid Service
    • Chapter IX High Pressure Piping
    • Chapter X High Purity Piping
    • Review codes appendix
    • Review of codes tables

Our Methodology

    • Make coaching and monitoring innovative and using modern
    • Media training also using on the go training by using interactive means and focusing on
    • The exercises, practical applications and real situations study
    • Live delivery method, instructor-led training
    • Experienced consultant, trainers, and professional
    • Qualified trainer with high-level experience

Attendance Reports

    • Send daily attendance reports to training departments
    • Send full attendance report to training dep. by the end of the course
    • Attend 100 % from the course days also provide daily
    • Issue attendance certificate for participant who attend minimum 80% from the course duration

Pre/Post Reports

    • Pre- assessment before starting training
    • Post assessment after finishing training
    • Full report for the difference between Pre-& Post assessment

Who Should Attend

    • QC & QA Inspectors
    • Maintenance Engineers
    • Inspection & testing professionals
    • Fabrication Engineers
    • QA/QC reliability professionals for oil and gas (Petrochemical and Refining) operations
    • Fresh graduates, piping engineers and designers
Date City Venue Language Price Status Register
13 Oct 24 Oct - 2024 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
01 Dec 12 Dec - 2024 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
19 Jan 30 Jan - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
06 Apr 17 Apr - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
18 May 29 May - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
20 Jul 31 Jul - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
10 Aug 21 Aug - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
12 Oct 23 Oct - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register
30 Nov 11 Dec - 2025 Al Khobar 5 Stars Hotel English SAR 16275 Planned Register