Maintenance/Troubleshooting Of UPS Systems and Battery Power Supplies

  • Course Code
    EPET-010

Maintenance/Troubleshooting Of UPS Systems and Battery Power Supplies

  • Where a company regards electrical power as critical then there will be a need for a continuous or back up power system. The installation of a UPS will provide the necessary continuity. There are however problems with these installations when there is a need for maintenance especially the use of by-pass. Power Quality compatibility problems may cause failure, which was the reason for the original UPS installation. 

Learning Outcomes

    • Understand the Basic Building Blocks Common to all UPS Systems
    • Have a Skill Makers of the Construction and Operation of the Major Types of Industrial UPS Systems
    • Understand how to maintain and Perform Test Lead-Acid and Ni-cad Battery Systems
    • Be able to identify the Hazards and Safe Work Practices Related to UPS Systems and its Batteries
    • Have learned basic troubleshooting techniques for UPS systems
    • Be able to implement preventive maintenance for UPS battery and battery charger, and annual testing

Course Contents

    Ups System Overview & Power Quality Basics

    • Rectifier 
    • Inverter 
    • Static switch 
    • Manual bypass switch 
    • What constitutes power quality?
    • Sags and swells
    • Voltage fluctuations and mitigation
    • Interruptions
    • Surges - their causes, effects and remedies
    • Noise and harmonics

    Battery Chargers

    • UPS charging limitations
    • AC Ripple current
    • Equalize charge
    • UPS efficiency and power factor
    • Battery sizing calculation
    • Adjusted battery load calculation
    • Voltage windows and number of cells
    • Cell selection

    Basics of Batteries

    • Types of batteries: primary and secondary
    • General features of lead-acid and nickel -cadmium batteries
    • Comparison of the chemistry involved
    • Lead acid batteries - subtypes, construction and relative features
    • Manufacture of batteries

    Charging and Discharging of Batteries

    • Float charging and boost (equalizing) charging
    • Facts about charging of lead acid batteries
    • Internal loss and the factors that affect it
    • Current during charging cycle - variants
    • Overcharging and undercharging
    • Sulphation and hydration
    • The discharge processes
    • Specifics about charging of UPS batteries
    • Nickel cadmium batteries 
    • Charging strategy for nickel cadmium batteries

    Battery Upkeep, Failures and Disposal

    • Need for upkeep and monitoring
    • Causes of failures and failure modes
    • Periodic inspection and residual life assessment
    • Test equipment and safety of personnel
    • Predictive monitoring by conductance testing
    • Disposal and recycling

    Battery and Battery Charger Preventative Maintenance

    • Comprehensive maintenance for your VRLA or flooded batteries
    • Measure of cell voltage levels
    • Visual inspection for leaks or bad cells
    • Spot check for connection torques
    • Load testing
    • Inspection of battery environment
    • Detailed report of battery test and inspection results and recommendations for corrective actions 
    • Preventive maintenance and recommendation of battery chargers

    Ups System Troubleshooting and Maintenance

    • Critically apply the manufacturer's recommendations
    • Basic use of test equipment and tools
    • Rectifier and battery charger troubleshooting
       

Our Methodology

    • Make coaching and monitoring innovative and using modern
    • Media training also using on the go training by using interactive means and focusing on
    • The exercises, practical applications and real situations study
    • Live delivery method, instructor-led training
    • Experienced consultant, trainers, and professional
    • Qualified trainer with high-level experience

Attendance Reports

    • Send daily attendance reports to training departments
    • Send full attendance report to training dep. by the end of the course
    • Attend 100 % from the course days also provide daily
    • Issue attendance certificate for participant who attend minimum 80% from the course duration

Pre/Post Reports

    • Pre- assessment before starting training
    • Post assessment after finish training
    • Full report for the deferent between Pre-& Post assessment

Who Should Attend

    • Maintenance Technicians 
    • Maintenance Supervisors 
    • Plant Engineers
    • Operators
Date City Venue Language Price Status Register
02 Feb 06 Feb - 2025 Al Khobar 5 Stars Hotel English SAR 12750 Planned Register
04 May 08 May - 2025 Al Khobar 5 Stars Hotel English SAR 12750 Planned Register
20 Jul 24 Jul - 2025 Dubai 5 Stars Hotel English SAR 14500 Planned Register
20 Jul 24 Jul - 2025 Cairo 5 Stars Hotel English SAR 14500 Planned Register
24 Aug 28 Aug - 2025 Al Khobar 5 Stars Hotel English SAR 12750 Planned Register
23 Nov 27 Nov - 2025 Al Khobar 5 Stars Hotel English SAR 12750 Planned Register